The four Control reference Points
1. This solution also aligns with the value delivery methodology and the six-step model.
2. The core idea here is that project control (performance management) must start in the
3. early stages of the project (the front end) and should not wait until final approval (the “baseline”).
4. Therefore, the control reference points move along the project life cycle